WATTS ANTENNA COMPANY

...the tough site solution

   Home

TRAINING

 

Watts Antenna Company conducts advanced in-factory training and on-site briefings tailored to meet customer requirements for system installation, optimization, maintenance and operation. Watts can organize training to accommodate any number of customer personnel and can be structured as a 4-6 hour briefing or an in-depth 3-4 day session on-site with hands-on experience with a newly-installed system.  Watts has provided such training at end-fire installations for the FAA, U.S. Navy, U.S. Air Force, and the aviation agencies in Norway and Switzerland, covering such areas as:

·  Pre-operational/pre-optimization technical procedures for authorized station personnel.

·  Familiarization with the system, including general requirements and specifications; theory of operation; standards and tolerances; periodic and corrective maintenance procedures; installation, integration and check-out; and troubleshooting. Participants receive individual copies of the pertinent instruction books and other materials.

 

·   The programs are designed to provide each attendee with a high level of proficiency in the end-fire systems, using Watts’ facilities and equipment for hands-on experience with major system sub-assemblies and include special topics on installation, system optimization and flight inspection.

·   49 students have attended 7 factory programs over the last three years.

·   37 students earned factory endorsement for installation and optimization.

·   21 individuals received factory endorsement as an end-fire trainer.

·   6 non-U.S. companies and agencies have sponsored 17 individuals to attend factory programs.

 

 

 

December 2006 Class: Dan Brooks, Christian Johansen, Ken Green, Mark Hall, Alan Gesser,
 Stein Kristiansen, Juan Lozano, Gary Resta, Marc Seymour, Aaron Wilson,
 Ingar Aaen, Giang Tran, John Johnson.

 

October 2005 Class: Alan Gesser, Dave Quinet, Horacio Munoz, John Johnson,
Jose Orlando Silveira, Luis Ramos, Juan Lozano, Dan Brooks (Watts Antenna)

 

May 2005 Class Picture: Francisco Forero, John Johnson, Francisco Cardona, Alf Bakken,
Mic Thompson, Juan Lozano, Dan Brooks.

 

Students Tune Interface Unit during Advanced Factory Training

 

October 2004 Class:  John Johnson, Dave Reul, John Santos, Jim Nulle, Dwayne Green,
 Chester Watts, Jr., Lateef Baruwa, Ernesto Etienne, Dan Brooks.
   

  

May 2004 Class: Front Row: Mike Goff, Daniel Hernandez, Off Jordet, Tore Odelein, Finn Reitan, Espen Rogne, Dan Brooks.  Standing: John Johnson, Jostein Lyngoy, Harald Austnes, Kjell Kvinnesland, Bret Rosen, Herve Demule, Leonixa Salcedo, Chester Watts, Jr., Ammyanna Williams, Mickey Lindecker, John Varas, Charles Portis, Alan Gesser.

                       

 

January 2003 Class: John Johnson, Dan Brooks, Joe Yates, Chester Watts, Bob Hoesly, Steve Schroeder, Les Simmons, Adel Chehade, Jim Gilliford, Alan Gesser, Frank Marcum.

 

The following tables identify the individuals who have received factory endorsement certification as a result of their participation in the rigorous week-long training programs and their performance on the comprehensive examinations.  Their company or agency affiliation is that at the time they attended the training program.

 

 CERTIFIED FOR END-FIRE TRAINER & OPTIMIZATION

No.

Trainee

Company

Training Date

Certifications Received

1

Bob Hoesly

THALES ATM

January 2003

Trainer & Optimization

2

Steve Schroeder

THALES ATM

January 2003

Trainer & Optimization

3

Adel Chehade

THALES ATM

January 2003

Trainer & Optimization

4

Mike Goff

FAA Academy

May 2004

Trainer & Optimization

5

Daniel Hernandez

MCAS Cherry Point

May 2004

Trainer & Optimization

6

Bret Rosen

FAA Contractor – Oklahoma City

May 2004

Trainer & Optimization

7

Herve Demule

Skyguide - Switzerland

May 2004

Trainer & Optimization

8

Mickey Lindecker

FAA Engineering – Oklahoma City

May 2004

Trainer & Optimization

9

Dave Reul

FAA – Atlanta

October 2004

Trainer & Optimization

10

Jim Nulle

AMSI

October 2004

Trainer & Optimization

11

Dwayne Green

FAA – Atlanta

October 2004

Trainer & Optimization

12

Elger Holland

Contractor - Georgia

March 2005

Trainer & Optimization

13

Francisco Forero

Socotel LTDA - Colombia

May 2005

Trainer & Optimization

14

Alf Bakken

Park Air Systems AS

May 2005

Trainer & Optimization

15

Mic Thompson

THALES ATM

May 2005

Trainer & Optimization

16

Dave Quinet

Ohio University

October 2005

Trainer & Maintenance

17

Jose Orlando Silveira

INFRANAV - Brazil

October 2005

Trainer & Maintenance

18

Christian Johansen

Park Air Systems AS

December 2006

Trainer & Optimization

19

Stein Kristiansen

Park Air Systems AS

December 2006

Trainer & Optimization

20

Ingar Aaen

Park Air Systems AS

December 2006

Trainer & Optimization

21

Aaron Wilson

Ohio University

December 2006

Trainer & Optimization

 

 

 

 

 

 

 

 

 

 

 

 

 

CERTIFIED FOR END-FIRE INSTALLATION & MAINTENANCE

No.

Trainee

Company

Training Date

Certification Received

1

Joe Yates

THALES ATM

January 2003

Installation & Maintenance

2

Jim Gilliford

THALES ATM

January 2003

Installation & Maintenance

3

Off Jordet

AVINOR - Norway

May 2004

Installation & Maintenance

4

Tore Odelein

AVINOR - Norway

May 2004

Installation & Maintenance

5

Espen Rogne

AVINOR - Norway

May 2004

Installation & Maintenance

6

Jostein Lyngoy

AVINOR - Norway

May 2004

Installation & Maintenance

7

Harald Austnes

AVINOR - Norway

May 2004

Installation & Maintenance

8

Kjell Kvinnesland

AVINOR - Norway

May 2004

Installation & Maintenance

9

John Varas

FAA - Washington

May 2004

Installation & Maintenance

10

John Santos

AMSI

October 2004

Installation & Maintenance

11

Luis Ramos

Radiocom SA - Colombia

October 2005

Installation & Maintenance

12

Horacio Munoz

Radiocom SA - Colombia

October 2005

Installation & Maintenance

13

Ken Green

FAA – Atlanta

December 2006

Installation & Maintenance

14

Mark Hall

FAA – Atlanta

December 2006

Installation & Maintenance

15

Gary Resta

FAA – Atlanta

December 2006

Installation & Maintenance

16

Giang Tran

FAA – Atlanta

December 2006

Installation & Maintenance

 

 

 

 

 

 

 

 

 

 

·         Post-installation optimization of the system includes antenna layout and interface unit checkout.

·         Airborne measurements can be arranged to collect data to assist with antenna system tune-up and on-ground adjustments to achieve final optimization and performance to ready the antenna for flight inspection.

Inspection Aircraft for Flight Check